Model Ship Rigging Glossary: Shrouds, Ratlines, Stays & More
Rigging has a language of its own, and half the confusion for beginners is simply the terms. Here are the words you'll meet on every plan, defined plainly.
Standing rigging (holds the masts)
- Shrouds — the ropes that run from the mast down to the sides of the ship, stopping the mast from swaying sideways. Usually the thickest lines on the hull.
- Stays — ropes running fore-and-aft, holding the mast from leaning forward or back. The forestay runs forward, the backstay aft.
- Ratlines — the horizontal "rungs" tied across the shrouds, forming rope ladders the crew climbed. The detail line most people recognise as "rigging."
- Deadeyes — round wooden discs the shrouds pass through, used to tension the rigging.
- Chain plates / channels — where the shrouds attach to the hull.
Running rigging (moves the yards and sails)
- Yards — the horizontal spars the square sails hang from.
- Braces — ropes that swing the yards around.
- Halyards — ropes that hoist the yards and sails.
- Sheets — ropes that control the lower corner of a sail.
- Lifts — ropes that support the ends of the yards.
- Buntlines / clewlines — finer lines that gather the sail to the yard.
Rope itself
- Lay — the direction and twist of the strands. Laid rope shows a visible spiral; that's what you're reproducing when you make your own.
- Cable / anchor cable — the heavy rope running from the anchor up through the hull. The thickest line on the ship.
- Scale rope — rope made to a model's scale, so a 1:72 shroud reads correctly next to a 1:72 hull.
Why the words matter
When a plan says "shroud, 2 mm," it means the thick line from mast to channel — not the ratline, not the stay. Getting the families right is the first step; making each one at a consistent thickness is the second. That's exactly what the RopeMaster 4000 is for — see how to make scale rope to begin.
New to all of it? Start at Model Ship Rigging for Beginners.